by Dave Murray | 12 August, 2026 | Ecoreef Projects
Ohurakura Road, Elliots Bridge Elliotts Bridge demonstrates how collaboration and innovation can transform infrastructure delivery. Working together, Lattey Group, Fulton Hogan, Hastings District Council, and HEX-LOC® delivered a resilient solution following Cyclone...
by Dave Murray | 12 August, 2026 | Ecoreef Projects
Taieri Mouth, Dunedin The first HEX-LOC® South Island project was delivered along the coastline south of Dunedin. Developed to address ongoing coastal erosion that had compromised a critical section of roadway, the solution reinstated a safe two-way road and shoulder...
by Dave Murray | 27 August, 2025 | Ecoreef Projects
Glencoe Gorge Underslip Cyclone Gabrielle worsened long-standing slope instability in Glencoe Gorge, threatening SH50 and nearby private land. With challenging terrain, groundwater seepage, and stream erosion, traditional solutions were unsuitable. Transport Rebuild...
by Dave Murray | 27 August, 2025 | Ecoreef Projects
Te Awanga Coastal Protection After Cyclone Gabrielle caused severe flooding in Te Awanga, Hastings District Council partnered with EcoReef® to protect the coastal lagoon (home to critical stormwater infrastructure) and nearby properties. A modular EcoReef® retaining...
by Dave Murray | 27 August, 2025 | Ecoreef Projects
River Road Roadway Protection To address ongoing erosion and road damage in Ākitio (worsened by Cyclone Gabrielle in 2023), the Tararua Alliance worked with HEX-LOC® to install a modular retaining wall system. The HEX-LOC® solution was chosen for its strength,...
by Dave Murray | 8 May, 2024 | Ecoreef Projects
Whatarangi coastal protection Located on Cape Palliser’s rugged coastline, the first EcoReef® coastal installation has enabled reinstatement and protection of the adjoining roadway for over two years. Enduring two winters with large and unpredictable seas, the...
Recent Comments