by Dave Murray | 9 May, 2024 | Ecoreef Projects
Peaks Road Bridge Abutment Flooding events in 2023 left the foundations and connecting roadway of this bridge undermined, compromising its safety. This HEX-LOC® design incorporates an abutment that encases the foundations and supports the road section leading onto the...
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Taipo Quarry Flood Protection Inundated with flood water during the extreme rain events of 2023, this section of roadway had been left with several dropouts along its shoulder. Consisting of two separate structures, this build incorporated a point facing toe structure...
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Mangatoetoe Bridge Abutment Constructed in only 24 hours, the HEX-LOC® system was utilised to construct an abutment surrounding the exposed piles of this bridge. With long interlocked wing walls and a large stable footprint this abutment has been designed to protect...
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Cape Palliser Coastal Protection Extreme erosion had taken a 3 metre high section out of Cape Palliser’s only access road reducing it down to one lane. EcoReef® provided the optimal solution. With no limitations to where the system can be built, the design allowed the...
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Kiriwhakapapa Bluff Repair HEX-LOC® has provided an optimised solution for this steep and technical site. Carved into the underlying rock, the structure conforms to the natural terrain without the need for extensive ground preparation. ER-1/2 units were used to create...
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Tinui Roading Repair Taking this sites weak geology and a history of subsidence into account, HEX-LOC® modules were used to construct a large geo-grid extending underneath the road pavement. With a total length of 40 meters, this build was completed in only 3 days....