by Dave Murray | 5 November, 2026 | Case Studies
Figure 1: HEX-LOC® structure after construction – May 2025 Case study Ākitio Erosion Protection Project:Proven performance during the April 2026 flood event Overview Following a major slip in 2021 and further degradation during Cyclone Gabrielle in 2023, Tararua...
by Dave Murray | 24 September, 2025 | Case Studies
Case study Te Awanga coastal protection Overview The Te Awanga coastal community experienced significant flooding from Cyclone Gabrielle and other storm events, threatening private properties and the lagoon – critical infrastructure for Hastings District Council’s...
by Dave Murray | 24 September, 2025 | Case Studies
Case study Whatarangi Cape Palliser – revitalising coastal resilience Overview Facing relentless erosion and storm damage along South Wairarapa’s exposed southern coastline, the South Wairarapa District Council needed a long-term solution to protect Cape Palliser Road...
by Dave Murray | 17 September, 2025 | Case Studies
Case study Glencoe Gorge Underslip Overview The underslip site on State Highway 50 is located within the steeply incised Glencoe Gorge, where the road traverses a gully with persistent groundwater seepage and a stream (Glencoe Stream) running below. The road has a ~6%...
by Dave Murray | 24 September, 2025 | Case Studies
Case study Cape Palliser – storm resilience Overview This EcoReef® system was the first of its kind, designed and installed as a “Proof of Concept”. For comparative analysis, traditional riprap was installed at either end of the EcoReef® structure, all subjected to...