by Dave Murray | 13 May, 2024 | Ecoreef Projects
Cape Palliser Coastal Protection Extreme erosion had taken a 3 metre high section out of Cape Palliser’s only access road reducing it down to one lane. EcoReef® provided the optimal solution. With no limitations to where the system can be built, the design allowed the...
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Kiriwhakapapa Bluff Repair HEX-LOC® has provided an optimised solution for this steep and technical site. Carved into the underlying rock, the structure conforms to the natural terrain without the need for extensive ground preparation. ER-1/2 units were used to create...
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Tinui Roading Repair Taking this sites weak geology and a history of subsidence into account, HEX-LOC® modules were used to construct a large geo-grid extending underneath the road pavement. With a total length of 40 meters, this build was completed in only 3 days....
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Tararua Road Repair A known trouble-spot on a curved section of road offered another great opportunity for the HEX-LOC® to display its suitability for roading repairs. Rapid construction time resulted in minimal traffic disruption and a significant reduction in cost....
by Dave Murray | 13 May, 2024 | Ecoreef Projects
Hurupi Dropout Configured as a retaining wall, the HEX-LOC® system was utilised for this steep and technical roading dropout. As a unique feature of the system, modules in the upper layers of the wall interlock to form a geogrid that extends underneath the road. This...
Recent Comments